Leveling footings for concrete structures is a critical step to ensure stability and durability. Properly leveled footings provide a solid foundation, supporting the weight of the structure and preventing uneven settling over time. This process requires precise measurements, the right tools, and attention to detail to achieve a level and even surface. Whether working on a small project or a larger construction site, understanding the basics of leveling footings can save time, reduce errors, and contribute to a successful build.

In this blog post on how to level footings concrete, we will discuss the key steps and best practices for achieving a level footing. We will also explore different methods and tools used in this process.
Why is It Important to Level Footings?
Leveling footings is essential for the overall stability and longevity of any structure. Uneven footings can lead to structural imbalances, causing cracks, shifting, or even potential collapse over time. A level footing ensures that the load of the structure is evenly distributed, reducing stress on specific areas and preventing unnecessary strain on the foundation materials.
Additionally, properly leveled footings help to avoid water pooling around the base, which can lead to erosion or weakening of the foundation. Taking the time to level footings correctly not only guarantees safety but also saves costs in repairs and maintenance down the line.
Needed Materials
Before starting the process of leveling footings, gather the necessary materials and equipment. This includes:
- Measuring Tape or Laser Level for Accurate Measurements
- Shovel for Removing Excess Soil
- Concrete Mix to Fill Any Voids or Gap
- Leveling Tools, such as a Straight Edge or Float
- Vibrating Plate Compactor to Settle the Soil
8 Step-by-step Guides on How to Level Footings Concrete
Step 1: Prepare the Area
The first step in leveling footings is to prepare the area where the footing will be placed. Begin by clearing all debris, vegetation, and loose soil from the designated site. Use a shovel or other appropriate tools to excavate the area to the required depth, ensuring that the base is firm and free of soft spots.
If necessary, compact the soil using a vibrating plate compactor to create a stable and even surface. This preparation is crucial to prevent future shifting or settling that could compromise the structure’s stability. Take accurate measurements to make sure the area aligns with the planned dimensions of the footing.
Step 2: Lay the Formwork
After preparing the area, it’s time to lay down the formwork. The formwork consists of temporary structures that hold the concrete in place until it sets and hardens. Use sturdy materials such as wood or metal to create a strong frame around the perimeter of the footing area. Be sure to align and level the formwork with caution, as any discrepancies will affect the final result.

It’s also essential to ensure the formwork is well-supported and anchored to prevent shifting or collapsing before the concrete sets.
Step 3: Mix and Pour Concrete
Mix the appropriate ratio of concrete according to the manufacturer’s recommendations. Once mixed, pour it into the prepared area, filling up to three-quarters of the depth needed. Use a shovel or rake to distribute the concrete evenly.
To eliminate any air pockets, use a vibrating plate compactor on top of the formwork. This process will help settle the concrete while maintaining its level. Continue pouring until reaching the desired height for your footing.
Step 4: Check Levelness Using a Straight Edge
Once the concrete has been poured to the desired height, the next step is to ensure that the surface is level. Take a straight edge, such as a sturdy piece of wood or a leveling tool, and place it across the top of the formwork. Move the straight edge back and forth in a sawing motion to spread and smooth out the concrete surface.
While doing this, carefully check for any dips, high spots, or uneven areas. Use a spirit level to verify that the surface is perfectly level across all directions. If any irregularities are found, adjust the height by adding or removing small amounts of concrete as needed. This step is crucial to achieving a stable and uniform footing, which will support the structure effectively once the concrete sets and hardens.
Step 5: Smooth the Surface with a Float
After ensuring the surface is level, use a float to smooth out any imperfections and create a consistent finish. A float is a tool specifically designed for concrete finishing, consisting of a flat surface attached to a handle. Move the float over the entire surface in long, sweeping motions until achieving an even and uniform texture.
But be careful not to overwork the concrete, as it can cause cracking or weakening of the surface. If you notice any low spots while floating, add a small amount of concrete and re-level with the straight edge.
Step 6: Cure and Harden the Concrete

After completing all necessary adjustments and smoothing, leave the concrete to cure and harden according to the manufacturer’s recommendations. This process typically takes several days, depending on the type of concrete used.
To prevent cracks in the set concrete, keep it moist by lightly spraying it with water during this curing period. Covering it with plastic sheeting may also help retain moisture while allowing for air circulation.
Step 7: Remove Formwork
Once the concrete has fully cured and hardened, it’s time to remove the formwork. Carefully dismantle the frame and clean away any debris or leftover materials. Use a brush or broom to sweep off any excess dirt or dust from the surface.
It’s also a good idea to seal the concrete with a waterproofing agent to protect it from moisture and other potential damages.
Step 8: Finishing Touches
To complete the process of leveling footings concrete, do a final inspection of the surface for any touch-ups needed. If necessary, use a small amount of concrete mix to fill in any gaps or uneven areas. Once satisfied with the result, leave it to cure completely before beginning construction on top.
Following these eight steps on how to level footings concrete will ensure a sturdy and level footing for your structure. It’s essential to take the time to properly level footings, as it sets the foundation for a safe and durable building. Remember also to follow all safety precautions when handling equipment and materials, as working with concrete can be physically demanding and potentially hazardous.
Additional Tips

- Always follow the recommended safety measures and use appropriate protective gear when handling concrete and related tools.
- Take regular breaks while working to avoid fatigue or injury.
- Consult a professional if you are unsure about any step of the process or if you encounter any unexpected challenges.
- Double-check measurements and leveling at each step to ensure accuracy and prevent future problems.
- Keep in mind that environmental factors such as temperature and humidity can affect the curing time of concrete. Adjust accordingly to achieve optimal results.
By following these tips for leveling footing concrete, you can create a strong foundation for your building project that will stand the test of time. Remember to always prioritize safety, precision, and patience when working with concrete to achieve the best possible outcome. Happy building!
Frequently Asked Questions
Q1: How Long Does It Take for Concrete to Cure?
A: Depending on the type of concrete used, curing can take anywhere from a few days to several weeks. It’s essential to follow the manufacturer’s recommendations for proper curing time. It’s also crucial to keep the concrete moist during this period to prevent cracks from forming.
Q2: Can I Use Any Type of Concrete for Footings?

A: It’s important to use a high-strength concrete mix specifically designed for footing applications. These mixes typically have a higher compressive strength and are more resistant to moisture, making them ideal for supporting structures.
Q3: Can I Level Footings on My Own or Should I Hire a Professional?
A: While it is possible to level footings on your own, it requires careful planning, proper equipment, and physical labor. If you don’t have experience with construction or working with concrete, it may be best to hire a professional to ensure the job is done correctly and safely. Additionally, if your structure requires specific design considerations or has complicated footing requirements, it’s best to consult with an engineer or architect for guidance.
Conclusion
Properly leveling footings is a critical step in any construction project, as it ensures the stability and longevity of the structure being built. By following the outlined steps on how to level footings concrete and taking the time to prepare, pour, and finish the concrete accurately, you can achieve a solid foundation that meets the necessary building standards.
Remember that attention to detail and patience during each phase will pay off in the long run, minimizing potential issues and ensuring safety. Whether you choose to tackle the project independently or enlist professional help, the effort invested in creating a sturdy footing will provide a reliable base for your construction.