Back To Home

How to Install Underlayment on Concrete

Written By

Carmen

/

Installing new flooring over a concrete subfloor can transform a basement or ground-level room, but a successful project requires more than just laying down planks. The secret to a durable, comfortable, and long-lasting floor lies in the layer you don’t see: the underlayment. This critical barrier protects your new flooring from moisture, provides cushioning underfoot, and reduces noise. While it might seem like an extra step, skipping it can lead to major problems down the road. This guide is designed for the DIY homeowner, providing clear, beginner-friendly instructions on how to install underlayment on concrete, ensuring your new floor is protected from day one.

How to Install Underlayment on Concrete

Installing underlayment on concrete is a crucial step in ensuring your floor lasts for years to come. Whether you’re working with laminate, vinyl, or engineered wood, the underlayment acts as a foundation that addresses common issues like uneven surfaces and moisture. While the process may seem intimidating at first, with the right tools and some preparation, it can be a straightforward and rewarding DIY project. By following these steps, you’ll create a smooth, stable base that enhances the overall performance and comfort of your new flooring.

Tools and Materials

Before starting your underlayment installation, it’s important to gather all the necessary tools and materials. Having everything prepared will ensure the process runs smoothly. Here’s a list of essentials you’ll need:

Tools

  • Utility knife or scissors (for cutting the underlayment)
  • Measuring tape
  • Straight edge or ruler
  • Stapler or tape (depending on the type of underlayment)
  • Rubber mallet (optional, for securing edges)

Materials

  • Underlayment (selected based on your flooring type)
  • Moisture barrier (if required for your project)
  • Adhesive tape (to seal seams)

With these tools and materials at hand, you’ll be ready to begin the installation process with confidence.

8 Step-by-Step Guide on How to Install Underlayment on Concrete

Step 1: Prepare the Concrete Surface

Before you unroll any underlayment, your concrete subfloor must be clean, flat, and dry. Start by thoroughly sweeping and vacuuming the entire area to remove all dust, dirt, and debris. Scrape off any paint drips, drywall mud, or adhesives stuck to the floor. Next, check for high and low spots using a long, straight board. You will need to grind down any high spots and fill any significant cracks or low spots with a concrete leveling compound. A smooth, flat surface is essential for ensuring your final flooring clicks together properly and does not have any bouncy or uneven spots.

Your Concrete 
Subfloor Must Be Clean

Step 2: Conduct a Moisture Test

Concrete is porous and can wick moisture from the ground, which is the number one enemy of most flooring types like laminate and engineered hardwood. Because of this, performing a moisture test is a non-negotiable step. A simple and effective DIY method is the plastic sheet test. Tape a 2×2 foot square of clear plastic sheeting to the concrete, sealing all four edges with duct tape. Leave it in place for at least 24 hours. After a day, peel it back and check for condensation on the plastic or a darkened appearance on the concrete. Any sign of moisture means you need a robust vapor barrier.

Step 3: Choose the Right Underlayment

Not all underlayments are created equal, especially for concrete applications. You need a product that includes an integrated vapor barrier. These are often labeled as “2-in-1” or “3-in-1” underlayments. A 2-in-1 product typically provides cushioning and a moisture barrier. A 3-in-1 product adds sound-dampening properties as well. Always check the specifications of both your flooring and the underlayment to ensure they are approved for use over concrete. Choosing the correct type of underlayment is the most important decision you’ll make in this process, as it directly impacts the protection and longevity of your new floor.

Step 4: Roll Out the First Row

Begin at the longest wall of the room. Unroll your first row of underlayment with the vapor barrier side facing down against the concrete. The plastic or foil side is almost always the moisture barrier. Run the underlayment up the wall by about one or two inches. This creates a complete seal and ensures that moisture cannot creep up from the edges of the slab and affect your flooring. You can temporarily tape the underlayment to the base of the wall to hold it in place. Do not permanently attach the underlayment to the concrete subfloor itself.

Step 5: Cut the Underlayment to Fit

Once you reach the end of the wall, you will need to cut the underlayment. Use a sharp utility knife and a straight edge to make a clean, straight cut. Remember to allow the underlayment to run up the far wall by an inch or two as well. Cutting it neatly against the wall will ensure that you have a continuous barrier across the entire floor. Take care when cutting around obstacles like support posts or pipes. Make your cuts as precise as possible to maintain the integrity of the vapor barrier in those areas.

Use a Sharp Utility Knife And a Straight Edge

Step 6: Lay the Subsequent Rows

Roll out your second row of underlayment next to the first one. Most underlayment products designed for floating floors come with a pre-attached adhesive strip and an overlap flap. You should butt the main body of the second row up against the first row without overlapping the padding itself. The thin plastic flap is designed to overlap the previous row. This creates a continuous moisture barrier across the seam. If your underlayment does not have this feature, you will need to butt the edges together and seal the seam with a specialized underlayment tape.

Step 7: Seal All Seams Securely

Creating a completely sealed vapor barrier is the primary goal when installing underlayment on concrete. Once you have laid down a few rows, go back and seal the seams. If your underlayment has a built-in adhesive strip, peel the backing off and press the overlapping flap down firmly. If there is no built-in adhesive, use a moisture-proof underlayment tape to seal every seam between the rows. Ensure the tape is applied smoothly without any gaps or wrinkles. This meticulous sealing prevents any moisture from finding a path through the seams to your flooring.

Step 8: Trim the Excess Around the Perimeter

After you have covered the entire floor and all the seams are taped, you can trim the excess underlayment that runs up the walls. This step is typically done after the flooring installation is complete, just before you install the baseboards or quarter-round molding. The molding will hide the cut edge of the underlayment, leaving a clean, professional finish. Leaving the excess in place during the flooring installation helps ensure it doesn’t slip down and create gaps in your moisture barrier along the perimeter of the room.

Down and Create Gaps in 
Your Moisture Barrier

Frequently Asked Questions

Do I Really Need a Vapor Barrier on Concrete?

Yes, absolutely. All concrete slabs, even those that appear perfectly dry, have the potential to transmit moisture vapor from the ground. This moisture can become trapped under your flooring, leading to mold, mildew, and eventually the warping or buckling of your floorboards. A vapor barrier is a non-negotiable requirement for installing almost any type of flooring, especially laminate or wood, over a concrete subfloor.

What Is the Difference Between a 2-in-1 and 3-in-1 Underlayment?

The primary functions of underlayment are cushioning, moisture protection, and sound absorption.

  • A 2-in-1 underlayment typically combines cushioning foam with a built-in vapor barrier film, making it suitable for concrete installations.
  • A 3-in-1 underlayment includes cushioning, a vapor barrier, and an additional layer or feature for sound dampening, which helps reduce footfall noise.

Can I Use Standard Underlayment and a Separate Vapor Barrier?

Yes, this is a perfectly acceptable method. You can first lay down a separate layer of 6-mil polyethylene plastic sheeting, which acts as your vapor barrier. You would then install a standard underlayment (without a built-in barrier) on top of it. When using this method, be sure to overlap the seams of the plastic sheeting by at least 6-8 inches and tape them securely to create a continuous barrier.

Which Way Does the Underlayment Go Down on Concrete?

Generally, the plastic or foil side of the underlayment is the vapor barrier and should be placed face down, directly against the concrete. The foam or felt side should face up, providing a cushion for your new flooring. Always consult the specific manufacturer’s instructions for your underlayment product, as there can be exceptions. The instructions will always specify the correct orientation.

What Happens if You Don’t Let Underlayment Acclimate?

Unlike solid hardwood or laminate flooring, underlayment itself does not require a long acclimation period. It is dimensionally stable and is not significantly affected by temperature or humidity changes. You can typically install it as soon as you bring it into the room. However, your actual flooring material does need to acclimate, so be sure to follow the flooring manufacturer’s guidelines for that crucial step.

Underlayment Itself Does Not Require a Long

Conclusion

Properly installing underlayment is a foundational step that ensures the success and durability of your new floor. It may be an invisible layer in the finished project, but its role in providing moisture protection, comfort, and stability is immense. By carefully preparing your concrete, choosing the right material, and meticulously sealing every seam, you create a robust barrier that will protect your investment for years. You now have a comprehensive understanding of how to install underlayment on concrete. With this knowledge, you can confidently proceed with your flooring project, knowing you’ve built it on the right foundation.